I’ve managed my own stock portfolio since January 2026 and I study finance and economics. This page holds my approach, my company analyses and my papers.

1Approach

What I buy and why

I look for promising companies in the layers of AI infrastructure: the businesses that build, connect and power everything AI runs on.

  1. How to read this

    What happens when you ask an AI a question

    Your question leaves your phone and travels down a stack of seven layers, each one built by different companies. Every layer has a problem that limits how fast AI can grow. The companies that solve those problems are the ones I look for.

    Scroll to go down the stack

  2. Layer 1 of 7

    Cloud

    Rents out AI computers by the hour

    The problem
    Running a big AI model takes thousands of chips that cost tens of thousands of dollars each, plus a building to put them in. Almost no company can buy that.
    What these companies do
    Build giant data centers once and rent the computing power to everyone else, by the hour.

    Together, Microsoft, Amazon and Alphabet are spending hundreds of billions of dollars a year on AI data centers.

    • MicrosoftMSFT
    • AmazonAMZN
    • AlphabetGOOGL
    • OracleORCL
    • CoreWeaveCRWV
  3. Layer 2 of 7

    Networking

    Makes thousands of chips work as one

    The problem
    A big model is trained on tens of thousands of chips at the same time. If the links between them are slow, the chips sit idle waiting for each other.
    What these companies do
    Make the switches, network chips and fiber optic links that move data between chips and servers.

    The biggest AI clusters now link more than 100,000 chips.

    • Arista NetworksANET
    • MarvellMRVL
    • CoherentCOHR
    • CredoCRDO
  4. Layer 3 of 7

    Chips

    Does the math

    The problem
    A regular processor is built to do a few things quickly, one after another. AI needs millions of simple calculations at the same moment.
    What these companies do
    Design GPUs and custom AI chips that run thousands of calculations in parallel.

    Nvidia sells most of the AI chips that go into data centers today.

    • NvidiaNVDA
    • AMDAMD
    • BroadcomAVGO
  5. Layer 4 of 7

    Memory

    Feeds the chips data

    The problem
    AI chips are so fast that they often sit waiting for data to arrive from memory. Engineers call this the memory wall.
    What these companies do
    Make high-bandwidth memory, stacked right next to the chip, and the storage that holds the data AI learns from.

    One high-bandwidth memory package stacks 12 or more memory chips on top of each other.

    • MicronMU
    • SK HynixKorea
    • SanDiskSNDK
    • SeagateSTX
  6. Layer 5 of 7

    Chipmaking

    Builds the chips

    The problem
    The best AI chips have features only a few nanometers wide. Only a handful of factories and machine makers in the world can produce them.
    What these companies do
    Run the chip factories, and build the machines and materials that print and check every chip.

    ASML is the only company in the world that makes the EUV machines needed for the most advanced chips.

    • TSMCTSM
    • ASMLASML
    • Applied MaterialsAMAT
    • Lam ResearchLRCX
    • KLAKLAC
  7. Layer 6 of 7

    Data centers

    Houses and cools the machines

    The problem
    AI servers are packed so tightly and run so hot that normal buildings and air cooling cannot keep up.
    What these companies do
    Build and run the buildings, plus the liquid cooling, power systems and electrical gear inside them.

    One rack of the newest AI servers can draw more than 100 kilowatts, so it is cooled with liquid instead of air.

    • VertivVRT
    • EquinixEQIX
    • Digital RealtyDLR
    • EatonETN
  8. Layer 7 of 7

    Power

    Keeps everything running

    The problem
    AI data centers need huge amounts of steady electricity, and new power plants and grid connections take years to build.
    What these companies do
    Generate steady electricity, from nuclear and gas, and make the turbines and grid equipment that deliver it.

    The largest AI campuses being built need a gigawatt or more, about the output of a nuclear reactor.

    • Constellation EnergyCEG
    • VistraVST
    • GE VernovaGEV
    • OkloOKLO

These are examples of companies in each layer, to show what I mean. They are not a list of what I own and not investment advice.

2Company analyses

Companies I’ve studied

  1. Nov 2026ExxonMobil (XOM)Quality at a full price
  2. DateCompany nameComing soon
  3. DateCompany nameComing soon
3Papers

Things I’ve written

  1. DatePaper titleComing soon
  2. DatePaper titleComing soon